Transmission Services

steel T&D 1 Diversified's transmission construction experience covers all aspects of wood and steel structure erection, re-conductoring and re-insulation projects.  Our crews are experienced in construction work in environmental sensitive landscapes.  We have worked with several state and federal agencies to assure that ESA and other enviornmental concerns are always addressed in a manner satisfactory to our client.

 

 

            Recent  PG&E Transmission Projects 

  • Diversified replaced 2,023 shunt splices on 230kv lines using helicopters exclusively for this project.   These six circuits crossed the San Francisco Bay where access was not possible due to sensitive enviornments.
  • Built 2 miles of new 115kv line in Fresno County.
  • Installed tower guards and high voltage signs on various PG&E tower lines.

              Recent Southern California Edison Transmission Projects 

  • Provided wind-storm response crews to replace more than 50 transmission poles after a devastating storm in Orange County.
  • Replaced poles and conductor on 20 miles of 69kv with 12kv under-builds on  a major highway right-of-way in Tulare County.
  • Installed steel pole in 230kv substation, transferred conductors over energized station and added new spans to station rack.                
                                                                                                    ANZ 3-05 1168

               Recent Nevada Power Corporation projects 

Up grade 21 - 138kv line sections and install new 138 kv lines in  Las Vegas, Nevada  including crossings of Interstate 15 in the downtown area. Replace thirty circuit miles of 954 ACSR with 954 SAC. Diversified installed pole foundations, set steel poles and reconductored existing lines having 230kv overbuild. 

Install five miles of 230kv double circuit with 138kv underbuild. In addition reconductor ten miles of existing 230kv line.

Diversified also installed twenty miles of OPGW and ADSS fiber optic cable. The latest in pulling equipment was utilized including the Condux AFB 506 tensioner , the FBR 518 hydrolic tensioner and Condux reel trailers.       

Other work included installing substation duct banks and pulling 145 kv 2000 mcm Copper UG cable.

 

Recent San Diego Gas and Electric projects                  

During the 2007 Southern California wildland fires Diverdified provided twenty five line crews to assist SDG&E replace both transmission and distribution lines.

 

                                 Sacramento Municipal Utility District

In 2008 Diversified crews resaged fourty miles of 230Kv line conductors

                                  Western Area Power Administration
 
 Diversified is presently building a sixteen mile 60Kv transmission line insulaed for 115kV, a substation and switching station for WAPA in  the Weaverville area of Northern California.  The project includes overseeing R/W clearing, access road construction and erosion control.
 
 
                              
           Click on link to see a helo set.  Courtesy of Blackhawk Helicopters.